Skip to main content

Corée / Architecture & Detail

By 9 mai 2010juillet 31st, 2017Publications

The « drilled » part was realized thanks to a toll of casting specially made for this construction. This metal « mold » with a width of about two meters was moved then drilled as one goes along. (…)